KG FASHION / insights

What Should Be Checked Before an Apparel Order Ships?

Connect the inspection reference, corrective actions and packing requirements before shipment release.

Explore this page ↓
Garments reviewed at the finishing inspection stage
Finishing inspection in the denim workflow
DENIM FACTORY / FOSHANSAMPLING / PRODUCTION

Set the Inspection Reference

Agree the sample, specification version, measurements, tolerances and defect definitions. If statistical sampling is required, agree the inspection plan and acceptance criteria. AQL is not a promise that every garment is defect-free.

Use Checks at the Right Stage

Material and early-production checks can identify problems before completion. Final inspection reviews finished goods against the agreed scope. Sampling cannot verify every unit or replace laboratory testing when specific performance evidence is required.

Resolve Findings and Verify Packing

Record defects, corrections and any required recheck. Review quantities by style, color and size, garment labels, folding, packaging and carton marks against the packing instructions. Confirm any buyer-specific packing requirements before packing begins.

Separate Inspection from Shipment Release

An inspection report records findings; release follows the agreed decision process. Confirm outstanding corrections, commercial conditions, packing records and transport arrangements before dispatch. Factory completion and arrival at the destination are different milestones.

Buyer Checkpoint

What evidence and outstanding actions will I review before authorizing shipment?

General guidance. Sample stages, checks, testing and release requirements are agreed for each project.

Technical Background

Related Manufacturing

Denim Shorts: product references and manufacturing review

Review the production preparation process

Start a conversation

Plan your next
production order.

Discuss Production →
Request a Quote